Within the framework of the law that entered into force on 31.05.2012 with the Law No. 6306 on Renewal of Disaster Risky Buildings ;
Turkey's around detected in carrying valid disaster risk identified the needs of the sociological these areas received principles of the present value engineering in this context earthquake resistant, aesthetic and ergonomic is the construction of buildings.
Unfortunately, the lands we live on contain active fault lines. We have experienced many earthquakes from the past to the present. Significant loss of life and property occurred. It has also dealt big blows to the country's economy. It has affected everyone living in this geography in different scales.
When no precaution is taken against the earthquakes we experience at frequent intervals, they become disasters that emerge from a natural event and experience great pain. While it was built on time, without any engineering service or even if some engineering services were received, insufficient inspections caused unhealthy structures to occur. In addition to these, unlicensed construction in areas with no zoning on shared parcels has created out of control cities.
As the solution of all these problems, the need for urban transformation has arisen. In addition to the renewal of buildings with a certain engineering foundations, social needs for the future are anticipated; It is aimed to construct buildings by considering them socially, economically, environmentally and spatially.
If you doubt the durability of the building you live in and want to rebuild your building by taking advantage of the URBAN TRANSFORMATION law, you should firstly have a RISK CONSTRUCTION TEST .
First of all, your building must be registered as Risky by the Ministry of Environment and Urbanization. Any of the owners should go and apply to any of the specially licensed companies authorized by the Ministry. As a result of the application made to us, our field personnel come to your building;
In the light of all these data, your carrier system is modeled in 3D first in the computer environment. According to the results of the concrete samples, your concrete class is determined and processed into this model. Finally, the predicted earthquake loads are also uploaded to the model of your building and a report showing the reactions of your building in this range is created. When these values are below the normal values, it allows you to include your ministry structure in Risky Building Group and benefit from state supports in urban transformation.
If we report our Risky Building report to the municipality to which we are affiliated, the municipality will write BUILDING RISK > to all property owners within the structure. If the owner who wishes to appeal to this letter of the municipality, he must appeal within 15 days. If there is any objection, an objection commission is established and re-examines the documents. As soon as the commission decides that the building is risky, your building will ENTER IN URBAN TRANSFORMATION AND WILL BE DEMOLISHED .
As property owners, after this stage, it is required to designate a contractor who will assume the scientific responsibility of the building and to prepare the Building Joint Decision Protocol showing that they accept it with 2/3 majority and report it within 60 days. If there is a delay due to disputes within the building, the ministry will allow another 30 days. If the necessary decisions are not taken within this additional period, your building will be demolished by the state and the demolition costs will be collected from the owners. If the building co-decision protocol is drawn up, the necessary contracts are signed with the contractor, architectural projects are created and construction begins.