In accordance with the architectural project, all floor plans including the basement floor, roof plans, their sections, details and accounts. In these calculations, in determining the physical parameters of the soil, soil-foundation-structure interaction and foundation design, the standards including engineering services and the Principles Regarding the Preparation of the "Soil and Foundation Study Reports" published by the Ministry are followed. Civil Engineers cut the floor plans from the top of the floor and express it in the direction it is facing upwards.
It is the drawing of projects aiming to increase the living standards, including works and operations such as cooling or heating, ventilation of the building, waste water discharge, hot water installation and fire extinguishing that fall into the field of mechanical engineering in construction works.
It is the work of drawing all the electrical installations that will meet the energy needs of a building in computer environment in accordance with the principles and laws in force. Also; projects in which details such as telephone, data, fire detection, grounding, voiceover, TV, camera are specified.